Moncton Stormwater Wetland
Moncton, NB
The urban stormwater wetland was commissioned by the City of Moncton engineering department to cope with signifi cant stormwater pollution into the City’s beloved Centennial Park. A 6 ft. stormwater culvert was diverted into a new 5 acre stormwater wetland. The wetland was designed for a minimum of 48 hours of retention time to uptake and treat nutrient laden stormwater before dispersing back into Jonathan Creek. The wetland was constructed in 2002.

download PDF